An empty shop unit, stripped back to the shell, fitted out over about two months.
What we did
We built the new layout in metal stud partitions filled with mineral wool and lined in fire-rated plasterboard. That included a fire wall, which the Building Standards officer inspected and was satisfied with.
A suspended ceiling with LED panels went across the shop floor. At the back we built a WC, a staff kitchenette and the corridor with doors through to the rear.
The owner left a review about the job, which you can read on our reviews page.
Video from the job
Materials
- Metal stud partitions with mineral wool
- Fire-rated plasterboard
- Suspended ceiling with LED panels
- WC and staff kitchenette