Skip to content
Shop Unit Fit-Out with a Fire Wall — finished work in Lanarkshire

Project

Shop Unit Fit-Out with a Fire Wall

Location
Lanarkshire
Duration
About 2 months
Year
2025

An empty shop unit, stripped back to the shell, fitted out over about two months.

What we did

We built the new layout in metal stud partitions filled with mineral wool and lined in fire-rated plasterboard. That included a fire wall, which the Building Standards officer inspected and was satisfied with.

A suspended ceiling with LED panels went across the shop floor. At the back we built a WC, a staff kitchenette and the corridor with doors through to the rear.

The owner left a review about the job, which you can read on our reviews page.

Video from the job

Boarding the fire wall at four times speed, the ceiling in with the joints taped, then the finished wall.

Materials

  • Metal stud partitions with mineral wool
  • Fire-rated plasterboard
  • Suspended ceiling with LED panels
  • WC and staff kitchenette

More from this job

Related projects

All projects →

Ready to transform your home?

Get a fixed quote. We usually reply same day.

Call Get a free quote