The project took 3 weeks due to the time of year as it was November and the glue on mesh needed longer to dry properly. Final render 1.5mm acrylic.
External wall installation 90mm glued to the wall and studded. This necessitated the extension of the window sills and the gas pipe as well as the lighting installations. The downspouts were adjusted to the thickness of the plumbing. The foundation was plastered and painted in the colour requested by the client.